• What to do about FERC's new INSM Order 887

  • Feb 8 2023
  • Length: 33 mins
  • Podcast

What to do about FERC's new INSM Order 887

  • Summary

  • FERC has issued Order 887, directing NERC to create new Critical Infrastructure Protection (CIP) cybersecurity standards for Internal Network Monitoring Systems (INSM). In this episode, Patrick Miller, CEO of Ampere Industrial Security talks with Carter Manucy, IT/OT Cybersecurity Director for Florida Municipal Power Authority (FMPA). Hear from a real electric utility asset owner, on what this Order means for the industry and what you should do next.

    Show links:

    Carter Manucy LinkedIn Profile - https://www.linkedin.com/in/cmanucy/

    FERC Order 887 - https://www.ferc.gov/media/e-1-rm22-3-000

    FERC INSM NOPR - https://www.federalregister.gov/documents/2022/01/27/2022-01537/internal-network-security-monitoring-for-high-and-medium-impact-bulk-electric-system-cyber-systems

    National Security Memorandum on Improving Cybersecurity for Critical Infrastructure Control Systems - https://www.amperesec.com/blog/industry-brief-national-security-memorandum-on-improving-cybersecurity-for-critical-infrastructure-control-systems

    NERC INSM Practice Guide - https://www.nerc.com/pa/comp/guidance/CMEPPracticeGuidesDL/CMEP%20Practice%20Guide%20-%20Network%20Monitoring%20Sensors.pdf

    Corresponding Ampere Blog post - https://www.amperesec.com/blog/what-to-do-about-fercs-new-insm-order-887

    Show more Show less

What listeners say about What to do about FERC's new INSM Order 887

Average customer ratings

Reviews - Please select the tabs below to change the source of reviews.